DURING- Gray Wall Adjustments
DURING- Our team removed non-load-bearing walls to reconfigure the space for a more open layout.
DURING- Gray Framing
Framing floating walls, required in basements by the local building code because of our expansive soils in Colorado
DURING- Gray Framing 2
DURING- These newly framed walls are a great example of “floating walls.” The gap between the 2 horizontal boards at the bottom of the wall prevents damage if the soil swells underneath the foundation.
DURING- Gray Drywall & Floor Prep
DURING- With the space cleared and walls framed, the next step is laying down new flooring.
DURING- Gray Floor Prep
DURING- The area is prepared for new flooring, with plumbing and electrical upgrades already in place.
DURING- Gray Floor Prep 2
DURING- The new vinyl floor was delivered and awaits installation in the new room.
DURING- Gray Floor Leveling
DURING- Floor leveling is underway to ensure the vinyl tiles have a seamless and level surface for installation.
DURING- Gray Vinyl Flooring
DURING- Vinyl floor tiles are a great durable and stylish flooring choice in a basement.
DURING- Gray Vinyl Flooring Transition
DURING- a seamless transition of vinyl flooring between rooms.
DURING- Gray Custom Shelving
DURING- The storage area is prepped for the custom shelves.
DURING- Gray Custom Shelving Installed
DURING- The custom shelving is hung in the storage area.
DURING- Gray Closet Bedroom Flooring
DURING- The closet area is prepped to hang doors and install carpet, so it has a seamless transition.
AFTER- Gray Closet Bedroom Flooring Seamless
AFTER- The completed closet includes a seamless carpet transition.